WELSH MARCHES NORTH: SHREWSBURY-HEREFORD
Engine: Jubilee class 4-6-0 No 5690 Leander
Load: 10 coaches, 380 tons tare, 400 tons full
-----------------------------------------------------
miles sch m/sec mi/hr
-----------------------------------------------------
0.00 SHREWSBURY 0 0:00
0.81 Sutton Bridge Jc SB 4 2:39 26
2.25 mp 2.25 5:49 27
4.25 mp 4.25 (Condover) 9:23 37/36
6.31 Dorrington SB 12:31 44/46
9.25 mp 9.25 (Leebotwood) 16:50 33
10.25 mp 10.25 18:43 30
11.75 mp 11.75 (All Stretton) 21:38 32/30
12.80 Church Stretton 24 23:30 39
15.38 Marsh Brook LC 26:37 61
16.75 mp 16.75 (Marsh Farm) 27:59 62/58
18.00 mp 18 29:13 63
sigs 2*
19.95 CRAVEN ARMS 36 33:57
----- -- -----
0.00 0 0:00
0.80 mp 20.75 2:28 31
2.92 Onibury 5:02 59
5.30 Bromfield 7:24 61
6.30 mp 26.25 p.w.s 20*
7.58 Ludlow (OHBS) 11:18 25*
10.55 mp 30.5 15:26 62
12.19 Woofferton 20 16:58 60
13.80 mp 33.75 18:46 53
15.30 Berrington 20:18 61/60
18.40 Leominster 31 23:27 60/65
20.88 Ford Bridge 25:41 64
22.90 Dinmore Tunnel N (OHBS) 28:01 25*
23.55 mp 43.5 (Dinmore) 29:21
26.88 Moreton-on-Lugg LC 33:20 57
28.30 mp 48.25 34:46 61
29.38 Shelwick Jc SB 50 35:53 57/58
31.11 HEREFORD 56 39:30
----- -- -----
Date: Saturday 13th March 1982
dep: Shrewsbury 11.57am..39 Late
arr: Hereford 1.29pm..19 Late
-----------------------------------------------------
Steam on the Welsh Marches Main Line Steam Archives Page