HEREFORD-BIRMINGHAM: THE WELSH MARCHES EXPRESS
Engine: Class 45 No 45141
Load: 12 coaches, 417 tons tare, 445 tons full
-----------------------------------------------------
miles sch m/sec mi/hr
-----------------------------------------------------
0.00 HEREFORD 0 0:00
1.71 Shelwick Jc 0 4:47 Slack
4.39 Withington 8:27 54/52
71
7.55 Stoke Edith 11:27 65
59
9.97 Ashperton 13:44 67/66
12.60 mp 137.25 15:58 75
sigs 20*
13.75 LEDBURY 15 18:23
15.60 mp 134.25 21:09 31
17.96 Colwall 25:13 49/43
19.85 mp 130 (Malvern Wells) 27:15 67
20.77 Great Malvern 28:02 69
21.91 Malvern Link 29:04 easy
23.58 Newlands SB sigs 30*
25.35 mp 124.5 (Bransford) 33:00 79
28.05 Henwick SB 35:44 59.2 av
28.70 WORCESTER FOREGATE ST 36:51 34.9 av
37:58 Stop
38:23
29.35 Tunnel Jc SB 37 40:12 Slack
31.61 Fernhill Heath FB 43:25 42.1 av
34.56 Droitwich Spa 43 46:51 51.5 av
38.86 mp 57.5 (Stoke Works) 52:29 45.8 av
40.98 BROMSGROVE 51 55:09 47.7 av
43.11 mp 53.25 (Blackwell) 56 60:31 23.8 av
44.54 Barnt Green 62:52 36.5 av
47.17 Longbridge 65:21 63.5 av
48.21 Northfield 66:51 easy
49.62 Kings Norton 62 69:24
via Camp Hill
56.08 Proof House Jc sigs
56.77 BIRMINGHAM NEW ST 80 84:56
----- -- -----
Date: Saturday 24th March 1984
dep: Hereford..5 Early
arr: Birmingham New St..R Time
------------------------------------------------------
Sulzer Type 4 Modern Traction Archives Page