LLANGOLLEN RAILWAY: 11.45am LLANGOLLEN-DEESIDE
12.20pm DEESIDE-LLANGOLLEN
Engine: Hunslet 0-6-0ST Darfield no 1
Load: 4 coaches, 137 tons tare, 140 tons full
--------------------------------------------------
miles m/sec mi/hr
--------------------------------------------------
0.00 LLANGOLLEN 0:00
0.40 Llangollen Goods SB 3:09
---- -----
0.00 0:00
0.45 Dee Viaduct 2:41 easy
0.85 mp 6.75 4:13 17
1.17 BERWYN 5:16
---- -----
0.00 0:00
0.66 Berwyn Tunnel E 2:46 23
1.03 Berwyn Tunnel W 3:52 20
1.43 mp 8.5 5:05 22
1.71 Deeside Halt 6:29
---- -----
0.00 0:00
0.28 mp 8.5 1:30 18
0.68 Berwyn Tunnel W 2:58 15
1.05 Berwyn Tunnel E 4:16 17
23
1.71 BERWYN 6:40
---- -----
0.00 0:00
0.32 mp 6.75 18
0.71 Dee Viaduct 3:01 easy
sigs 0*
1.17 Llangollen Goods SB 6:12
---- -----
0.00 0:00
0.40 LLANGOLLEN 2:34
---- -----
Date: 22nd September 1991:
dep: Llangollen 11.45am
arr: Deeside Halt 12.09pm
dep: Deeside Halt 12.20pm
arr: Llangollen 12.46pm
Note: Llangollen to Berwyn section of the
above was on 1.15pm service
-------------------------------------------------
Llangollen Railway Preserved Railways Archives Page