LLANGOLLEN RAILWAY: 10.30am CARROG-LLANGOLLEN
Engine: Class 20 no D8142
Load: 5 coaches, 181 tons tare, 185 tons full
--------------------------------------------------
miles m/sec mi/hr
--------------------------------------------------
0.00 CARROG 0:00
1.34 mp 11.5 3:11 38
sigs 5*
2.12 GLYNDYFRDWY 5:53
---- -----
0.00 0:00
1.22 mp 9.5 3:08 32
1.94 Deeside Halt 4:41 slack
2.22 mp 8.5 5:32 29
2.62 Berwyn Tunnel W 6:23 28
2.99 Berwyn Tunnel E 7:08 32
3.65 BERWYN 9:12
---- -----
0.00 0:00
0.32 mp 6.75 25
0.71 Dee Viaduct 1:48 easy
2:11 sig
11:14 stop
1.17 Llangollen Goods SB 13:26
---- -----
0.00 0:00
0.40 LLANGOLLEN 2:25
---- -----
Date: Sunday 10th June 1986:
dep: Carrog 10.40am..10 late
arr: Llangollen 1.22pm..27 late
Total of 19 mins delay at Llangollen Goods SB
-------------------------------------------------
Llangollen Railway Preserved Railways Archives Page