LLANDUDNO JUNCTION-CREWE: ? HOLYHEAD-CREWE
Engine: Class 37 no 37429 Eistedfodd
Load: 4 coaches, 128 tons tare, 135 tons full
---------------------------------------------------
miles m/sec mi/hr
---------------------------------------------------
0.00 LLANDUDNO JUNCTION 0:00
2.00 mp 221.5 (Mochdre) 3:02 65
3.00 mp 220.5 3:55 69
4.03 COLWYN BAY 5:22
----- -----
0.00 0:00
1.41 mp 218 (Old Colwyn) 2:23 59
2.41 Llysfaen 3:22 62
3.56 Llandulas 4:20 76
6.09 Abergele 6:18 72
8.47 mp 211 (Foryd) 8:46 66/72
10.36 RHYL 10:44
----- -----
0.00 0:00
2.61 mp 206.5 3:36 69
3.57 PRESTATYN 5:25
----- -----
0.00 0:00
1.04 mp 204.5 (Nant Hall) 1:52 55
3.48 Talacre 4:01 73
6.33 Mostyn 6:17 75/70
9.66 Holywell Junction 9:04 76
11.91 Bagillt 10:53 71
13.95 Flint 12:35 73
16.54 mp 189 (Rockcliffe Hall) 14:42 73
18.58 Shotton 16:22 73
20.63 Sandycroft SB 18:02 73
23.18 Mold Jc SB 20:04 73
24.42 Saltney Jc 21:09 69
25.54 mp 180 22:40 easy
26.39 CHESTER 24:32
----- -----
0.00 0:00
1.50 Christleton Tunnel E 3:04 58
3.15 mp 176 (Waverton) 4:36 72
4.90 mp 174.25 (Tattenhall Jc) 5:58 77
6.70 Tattenhall Rd 7:23 74
8.90 mp 170.25 (Brassey) 9:06 80
10.40 Beeston Castle SB 10:17 70
13.01 Calveley 12:26 74
15.15 mp 164 (Wardle) 14:04 80/74
17.40 Worleston 15:50 80
19.63 Steel Works SB 17:44 56*
sigs 15*
21.11 CREWE 21:57
---- -----
Date: Monday 15th May 2000:
dep: llandudno Junction 1.39pm
arr: Crewe 2.53pm
---------------------------------------------------
Class 37 English Electric Type 3 Modern Traction Archives Page