SOUTHERN REGION: 1.30pm WATERLOO-WEYMOUTH/BOURNEMOUTH
Engine: MN (Rebuild) class 4-6-2 No 35021 New Zealand Line
Load: 10 coaches, 336 tons tare, 355 tons full
-----------------------------------------------------
miles sch m/sec mi/hr
-----------------------------------------------------
0.00 BASINGSTOKE 0 0:00
2.51 Worting Jc SB 5 5:29 43
4.76 Wootton SB 8:26 50
8.28 mp 56 (Roundwood) 12:10 58
10.33 Micheldever 14:08 69/68
13.95 Wallers Ash SB 17:09 74
16.64 Winchester Jc SB 22 sigs 0*
18.81 WINCHESTER CITY 25 30:10
----- -- -----
0.00 0 0:00
3.12 Shawford 4:52 63
73
6.98 EASTLEIGH 12 8:08 67
9.27 Swaythling 10:18 63
10.68 St Denys 11:40 60
sigs 0*
11.58 Northam Jc SB 19 15:38
12.65 SOUTHAMPTON CENTRAL 22 18:56
----- -- -----
Date: Monday 6th June 1960
dep: Basingstoke 2.28pm..2 Early
arr: Southampton 3.20pm..R Time
-----------------------------------------------------
Bournemouth Line 1959-1961 Steam 1954-1967 Archives Page