NORTH YORK MOORS RAILWAY: 2.00pm GROSMONT-PICKERING: Engine: Battle of Britain 4-6-2 no 34072 257 Squadron Load: 8 coaches, 265 tons tare, 275 tons full. ----------------------------------------------------- miles sch m/sec mi/hr ----------------------------------------------------- 0.00 GROSMONT 0 0:00 0.21 Grosmont Tunnel Out 2:07 slip 0.75 mp 23.75 3:49 24 1.75 mp 22.75 6:12 26 2.75 mp 21.75 8:27 28 3.39 GOATHLAND 15 10:05 ---- -- ----- 0.00 0 0:00 1.61 mp 19.5 4:18 40 slack 10* 3.86 mp 17 11:21 33 slack 15* 5.36 Newtondale 15 15:27 ---- -- ----- 0.00 0 0:00 35 3:24 Emerg 9:13 Stop slack 20* 2.25 mp 13.5 12:01 37 3.19 LEVISHAM 11 15:40 ---- -- ----- 0.00 0 0:00 1.81 mp 10.75 (Farwath) 4:23 38/44 slack 15* 4.31 mp 8.25 9:57 41 5.10 New Bridge SB 11:55 15* 5.78 Uppermill Xg 14:25 5* 5.98 PICKERING 18 15:16 ---- -- ----- Date: 6th October 1991: dep: Grosmont 2.02pm..2 late arr: Pickering 3.16pm ----------------------------------------------------- NORTH YORK MOORS RAILWAY: 3.25pm PICKERING-GROSMONT: Engine: Battle of Britain 4-6-2 no 34072 257 Squadron Load: 8 coaches 265 tons tare, 270 tons full ----------------------------------------------------- miles sch m/sec mi/hr ----------------------------------------------------- 0.00 LEVISHAM 0 0:00 slack 15* 0.94 mp 13.5 3:22 29 1.44 mp 14 (top 1/60) 4:30 20 1.94 mp 14.5 5:44 24/26 2.69 mp 15.25 (top 1/49) 7:46 22 3.19 Newtondale 11 9:40 ---- -- ----- 0.00 0 0:00 slack 15* 1.25 mp 17 5:05 33 2.00 mp 17.75 (top 1/54) 6:02 30 2.50 mp 18.25 7:32 28 slack 15* 4.25 mp 20 11:56 36 sigs 10* 5.36 GOATHLAND 15 15:38 ---- -- ----- 0.00 0 0:00 0.64 mp 21.75 2:20 29/17* 1.64 mp 22.75 4:52 28 2.64 mp 23.75 6:53 32 sigs 0* 3.18 Grosmont Tunnel In 12:25 3.39 GROSMONT 15 14:02 ---- -- ----- Date: 6th October 1991: dep: Levisham 4.16pm..29 late arr: Grosmont 5.01pm..29 late ----------------------------------------------------- North York Moors Railway Preserved Railways Archives Page