NORTH YORK MOORS RAILWAY: 12.50pm GROSMONT-PICKERING:
Engine: Rebuilt WC class 4-6-2 no 34101 Hartland
Load: 7 coaches, 253 tons tare, 270 tons full
-----------------------------------------------------
miles sch m/sec mi/hr
-----------------------------------------------------
0.00 GROSMONT 0 0:00
0.21 Grosmont Tunnel Out 1:15
0.75 mp 23.75 3:31 20
1.75 mp 22.75 6:27 21/20
2.75 mp 21.75 9:22 21
3.39 GOATHLAND 15 11:31
---- -- -----
0.00 0 0:00
1.61 mp 19.5 4:22 33
slack 20*
3.86 mp 17 10:38 29
slack 15*
5.36 Newtondale 15 14:49
---- -- -----
0.00 0 0:00
1.00 mp 14.75 2:51 30
slack 20*
2.25 mp 13.5 5:53 30
3.19 LEVISHAM 11 8:51
---- -- -----
0.00 0 0:00
1.81 mp 10.75 (Farwath) 4:47 29/31
slack 15*
4.31 mp 8.25 11:01 27
5.10 New Bridge SB 13:17 15*
5.78 Uppermill Xg 16:04 5*
5.98 PICKERING 18 17:01
---- -- -----
Date: 2nd July 1995:
dep: Grosmont 4.01pm..11 late
arr: Goathland 4.13pm..8 late
dep: Goathland 1.25pm..15 late
arr: Pickering 2.08pm..11 late
Note: The Grosmont to Goathland section was timed on
the 3.50pm service, with load 7..239/255 tons.
-----------------------------------------------------
NORTH YORK MOORS RAILWAY: 2.20pm PICKERING-GROSMONT:
Engine: Rebuilt WC class 4-6-2 no 34101 Hartland
Load: 7 coaches, 253 tons tare, 270 tons full
-----------------------------------------------------
miles sch m/sec mi/hr
-----------------------------------------------------
0.00 PICKERING 0 0:00
0.20 Uppermill Xg 1:23 5*
0.88 New Bridge SB 3:49 10*
1.92 mp 8.5 6:39 26
slack 15*
4.17 mp 10.75 (Farwath ) 12:24 30
5.17 mp 11.75 14:59 22/24
sigs 10*
5.98 LEVISHAM 18 18:18
---- -- -----
0.00 0 0:00
0.94 mp 13.5 3:56 23
1.44 mp 14 (top 1/60) 5:14 21
1.94 mp 14.5 6:30 25
2.69 mp 15.25 (top 1/49) 8:30 22
26
3.19 Newtondale 11 10:12
---- -- -----
0.00 0 0:00
slack 15*
1.25 mp 17 5:18 26
2.00 mp 17.75 (top 1/54) 7:03 24
2.50 mp 18.25 8:15 27
p.w.s 15*
4.25 mp 20 12:51 29
sigs
5.36 GOATHLAND 15 17:09
---- -- -----
0.00 0 0:00
0.64 mp 21.75 2:23 22
1.64 mp 22.75 5:06 24/21
2.64 mp 23.75 7:49 25
3.18 Grosmont Tunnel In 10:17 easy
3.39 GROSMONT 15 11:49
---- -- -----
Date: 2nd July 1995:
dep: Pickering 2.28pm..8 late
arr: Grosmont 3.36pm..16 late
-----------------------------------------------------
North York Moors Railway Preserved Railways Archives Page