NORTH YORK MOORS RAILWAY: 10.20am PICKERING-GROSMONT: Engine: Class 5MT 2-6-0 no 42765 Load: 7 coaches, 233 tons tare, 250 tons full ----------------------------------------------------- miles sch m/sec mi/hr ----------------------------------------------------- 0.00 PICKERING 0 0:00 0.20 Uppermill Xg 1:41 5* 0.88 New Bridge SB 4:58 10* 1.92 mp 8.5 7:34 30 slack 15* 4.17 mp 10.75 (Farwath ) 13:16 32 5.17 mp 11.75 15:37 25* 5.98 LEVISHAM 18 18:04 ---- -- ----- 0.00 0 0:00 0.94 mp 13.5 3:19 25 1.44 mp 14 (top 1/60) 4:34 22 1.94 mp 14.5 5:49 26 2.69 mp 15.25 (top 1/49) 7:41 21 26 3.19 Newtondale 11 9:21 ---- -- ----- 0.00 0 0:00 slack 15* 1.25 mp 17 4:49 29 2.00 mp 17.75 (top 1/54) 6:30 23 2.50 mp 18.25 7:41 32 easy 28 4.25 mp 20 11:10 32 5.36 GOATHLAND 15 15:26 ---- -- ----- 0.00 0 0:00 0.64 mp 21.75 2:28 27/18* 1.64 mp 22.75 5:00 25/24 2.64 mp 23.75 7:22 27/25 sigs 0* 3.18 Grosmont Tunnel In 12:29 3.39 GROSMONT 15 14:10 ---- -- ----- Date: 4th October 1997: dep: Pickering 10.24am..4 late arr: Grosmont 11.26am..1 late ----------------------------------------------------- NORTH YORK MOORS RAILWAY: 12.50pm GROSMONT-PICKERING: Engine: Class 5MT 2-6-0 no 42765 Load: 7 coaches, 249 tons tare, 265 tons full ----------------------------------------------------- miles sch m/sec mi/hr ----------------------------------------------------- 0.00 GROSMONT 0 0:00 0.21 Grosmont Tunnel Out 1:39 0.75 mp 23.75 3:22 19 1.75 mp 22.75 7:04 13/15 2.75 mp 21.75 11:24 13 3.39 GOATHLAND 15 14:48 ---- -- ----- 0.00 0 0:00 1.61 mp 19.5 5:21 26/30 slack 20* 3.86 mp 17 10:56 29 slack 15* 5.36 Newtondale 15 15:01 ---- -- ----- 0.00 0 0:00 1.00 mp 14.75 2:44 29 slack 20* 2.25 mp 13.5 5:49 26 sigs 3.19 LEVISHAM 11 16:58 ---- -- ----- Date: 4th October 1997: dep: Grosmont 12.50pm..R time arr: Levisham 1.43pm ----------------------------------------------------- North York Moors Railway Preserved Railways Archives Page