THE FAIR MAID: PERTH-INVERKEITHING:
Engine: Class 5MT 4-6-0 no 44767
Load: 9 coaches, 327 tons tare, 340 tons full
-----------------------------------------------------
miles sch m/sec mi/hr
-----------------------------------------------------
0.00 PERTH 0:00
2.00 Hilton Jc SB 5:47 26/20*
3.06 Bridge of Earn 9:13 34
5.31 mp 12 12:44 38
7.01 Abernethy 15:38 33/30
9.60 Newburgh 19:58 42
10.81 mp 6.5 (Glenburn Q) 21:54 34
12.31 mp 5 24:43 31
15.15 Collesie 28:21 60/52
sigs 0*
17.31 LADYBANK 37:57 easy
18.11 mp 38.25 (Kingskettle) 39:25 36
20.21 Falkland Road 43:14 31
21.36 mp 35 (Lochmuir) 45:31 30
40
23.12 MARKINCH 49:07
----- -----
0.00 0:00
1.24 mp 32 3:05 34
2.49 mp 30.75 (Thornton Jc) 4:47 48
3.74 mp 29.5 (Randolphs Sdg) 6:35 37
5.24 mp 28 (Dysart) 8:53 42/35
5.99 mp 27.25 (Sinclairtown) 10:04 39
7.38 KIRKCALDY 12:06 42
8.49 mp 24.75 (Inverteil Jc) 13:42 44
10.49 Kinghorn 17:10 20*
12.24 mp 21 20:31 40
13.12 Burntisland 23:18 15*
14.49 mp 18.75 26:56 32
15.85 Aberdour 30:12 23
17.24 mp 16 (Dalgetty) 33:23 26
18.24 mp 15 (Donibristle) 35:02 40
easy
19.94 Inverkeithing Loop 38:57
----- -----
Date: Saturday 30th March 1985:
dep: Perth 2.39pm
arr: Inverkeithing Loop 4.13pm
Schedules not available
-----------------------------------------------------
Main Line Steam in Scotland Main Line Steam Archives Page