THE FAIR MAID: EDINBURGH-PERTH:
Engine: Jubilee class 4-6-0 no 5690 Leander
Load: 9 coaches, 327 tons tare, 340 tons full.
-----------------------------------------------------
miles sch m/sec mi/hr
-----------------------------------------------------
0.00 EDINBURGH 0:00
1.17 Haymarket 4:43 easy
1.81 Haymarket W Jc 6:24 38
3.23 mp 44 (Saughton Jc) 8:24 42
5.23 mp 42 (Gogar) 10:46 47
8.14 Ratho 14:28 47
10.73 mp 36.5 (Broxburn Jc) 17:45 47
12.48 mp 34.75 (Winchburgh Jc) 20:01 46
14.48 mp 32.75 (Philipstoun) 22:47 42
17.57 Linlithgow 27:01 47
19.98 mp 27.25 (Boness Jc) p.w.s 22*
22.24 Polmont 35:14 45/42*
24.69 mp 23.5 39:04 43
25.46 FALKIRK GRAHAMSTON sigs
27.18 Carmuirs E Jc 45:08 easy
27.60 Larbert Jc 45.53 easy
28.43 LARBERT 47:25 34/26*
30.66 Alloa Jc SB p.w.s 15*
32.48 Plean 55:35 39
34.19 mp 116 (Banockburn) 57:40 61
34.99 Polmaise SB 58:26 60
36.50 STIRLING 60:21 40*
38.30 Cornton SB 62:40 53
39.39 Bridge of Allan 63:57 46
41.35 Dunblane 67:40 25
42.94 mp 124.75 (summit) 71:52 19
44.06 Kinbuck 75:03 27
47.25 Greenloaning 79:56 46
49.94 mp 131.75 83:23 47
51.48 Blackford 85:37 38/40
slack 32*
53.83 Gleneagles 89:32 44/53
55.83 Auchterarder slack 30*
57.19 mp 139 93:58 59
58.49 Whitemoss SB stop 0*
59.94 Dunning 98:34 55/62
slack 15*
62.70 Forteviot 102:45 33
65.56 Forgandenny 106:22 54
67.40 Hilton Jc SB 108:39 40
68.69 mp 150.5 (Friarton) 110:45 36
69.40 PERTH 113:17
----- ------
Date: Saturday 30th March 1985:
dep: Edinburgh 12.34pm
arr: Perth 2.27pm
Schedules not known
Overhead bridge slacks in operation from Blackford.
-----------------------------------------------------
Main Line Steam in Scotland Main Line Steam Archives Page