SEVERN VALLEY RAILWAY: HIGHLEY-KIDDERMINSTER
Engine: 2251 class 0-6-0 no 3205
Load: 6 coaches, 192 tons tare, 205 tons full
--------------------------------------------------
miles m/sec mi/hr
--------------------------------------------------
0.00 HIGHLEY 0:00
0.25 mp 143 1:06 15*
0.89 Borle Viaduct p.w.s 15*
1.75 mp 141½ 5:14 33
2.33 ARLEY 7:25
---- -----
0.00 0:00
23
0.48 Victoria Bridge 1:33 15*
1.42 mp 139½ 4:01 27
1.95 Northwood Halt 5:36 10*
2.42 mp 138½ 6:50 33
sigs 15*
3.57 BEWDLEY 11:02
----- -----
0.00 0:00
0.19 Bewdley South SB 0:49 easy
0.46 mp 138 1:55
0.86 Rifle Range UB 2:44 29.4 av
1.33 Bewdley Tunnel S 3:35 33.2
1.60 Bewdley Tunnel N 4:04 33.5
2.04 Foley Park OB 4:54 31.7
2.46 mp 136 (Falling Sands V) 5:40 32.9
2.96 mp 135½ (Kidder Jn) 6:56 23.7
3.51 KIDDERMINSTER 8:49
---- -----
Date: Sunday 25th August 1984
dep: Highley 3.49pm
arr: Kidderminster 4.27pm
--------------------------------------------------
SEVERN VALLEY RAILWAY: KIDDERMINSTER-HIGHLEY
Engine: 2251 class 0-6-0 no 3205
Load: 6 coaches, 192 tons tare, 205 tons full
--------------------------------------------------
miles m/sec mi/hr
--------------------------------------------------
0.00 KIDDERMINSTER 0:00
0.55 mp 135½ 1:55 easy
1.05 mp 136 (Falling Sands V) 3:17 21.9 av
1.47 Foley Park OB 4:11 28.0
1.91 Bewdley Tunnel N 5:18 23.6
2.18 Bewdley Tunnel S 6:00 23.1
2.65 Rifle Range UB 7:13 23.2
3.32 Bewdley South SB 9:09 easy
3.51 BEWDLEY 10:03
---- -----
0.00 0:00
0.90 mp 138¼ (top 1/145) 2:58 30
1.40 mp 138¾ 3:54 33
1.62 Northwood Halt 5:06 10*
2.40 mp 139¾ 7:13 25
3.09 Victoria Bridge 9:18 15*
sigs 0*
3.57 ARLEY 12:01
---- -----
0.00 0:00
0.83 mp 141¾ 2:12 37
1.44 Borle Viaduct p.w.s 20*
2.08 mp 143 5:29 15*
2.33 HIGHLEY 6:38
---- -----
Date: Sunday 25th August 1984
dep: Kidderminster 4.50pm
arr: Highley 5.36pm
--------------------------------------------------
Back to Review: Smaller Western Locos Page