SEVERN VALLEY RAILWAY: BRIDGNORTH-KIDDERMINSTER
Engine: Class 43xx 2-6-0 no 7325 (as 9303)
Load: 7 coaches, 237 tons tare, 260 tons full
--------------------------------------------------
miles m/sec mi/hr
--------------------------------------------------
0.00 BRIDGNORTH 0:00
p.w.s 5*
0.55 Oldbury Viaduct 4:24 20*
0.86 Knowlesands Tunnel 5:12 25
1.17 mp 148¾ (summit) 5:56 29
2.19 Eardington 7:33 39
2.87 Sterns 9:46 10*
3.92 mp 146 12:32 33½
4.51 HAMPTON LOADE 15:09
---- -----
0.00 0:00
0.91 mp 144½ 2:43 26
1.71 Alveley Xg 4:41 20
2.16 HIGHLEY 6:31
---- ----
0.00 0:00
0.25 mp 143 1:19 15*
0.89 Borle Viaduct 2:45 33
1.75 mp 141½ 4:09 39
2.33 ARLEY 6:05
---- ----
0.00 0:00
19
0.48 Victoria Bridge 1:57 15*
1.42 mp 139½ 4:10 29½
1.95 Northwood Halt 5:34 15*
2.42 mp 138½ 6:34 31
3.17 mp 137¾ sigs 15*
3.57 BEWDLEY 10:24
----- -----
0.00 0:00
0.19 Bewdley South SB 1:00 easy
0.46 mp 138 1:59 24
0.86 Rifle Range UB 2:48 33
1.33 Bewdley Tunnel S 3:40 32
1.60 Bewdley Tunnel N 4:11 31½
2.04 Foley Park OB 4:59 33
2.46 mp 136 (Falling Sands V) 6:05 38
2.96 mp 135½ (Kidder Jn) 6:32 30
Kidderminster Loop 7:28
-----
10:22
3.51 KIDDERMINSTER 12:50
---- -----
Date: 27th September 1992:
dep: Bridgnorth 2.08pm..43 late
arr: Kidderminster 3.07pm..33 late
--------------------------------------------------
SEVERN VALLEY RAILWAY: KIDDERMINSTER-BEWDLEY
Engine: Class 43xx 2-6-0 no 7325 (as 9303)
Load: 7 coaches, 237 tons tare, 245 tons full
--------------------------------------------------
miles m/sec mi/hr
--------------------------------------------------
0.00 KIDDERMINSTER 0:00
0.55 mp 135½ 1:56 24
1.05 mp 136 (Falling Sands V) 2:53 38½
1.47 Foley Park OB 3:34 35
1.91 Bewdley Tunnel N 4:17 36
2.18 Bewdley Tunnel S 4:41
2.65 Rifle Range UB 5:20
3.32 Bewdley South SB 6:51 easy
3.51 BEWDLEY 7:46
---- -----
Date: 27th September 1992:
dep: Kidderminster 3.58pm..28 late
arr: Bewdley 4.06pm..24 late
--------------------------------------------------
Back to Review: Smaller Western Locos Page