WELSH HIGHLAND RAILWAY: CAERNARFON to DINAS:
Date: 1st September1999 14th May 2000
Engine: Blanche Mountaineer
Load: 3 coaches 3 coaches
----------------------------------------------------------------------
miles km m/sec mi/hr m/sec mi/hr
----------------------------------------------------------------------
(avge) (avge)
0.00 20.00 CAERNARFON 0:00 0:00
0.18 20.29 Lon Parc FB 1:06 1:03
0.59 20.95 Coed Helen OB 2:51 14.0 2:45 14.5
0.89 21.43 Hendy LC arr 4:03 14.9 4:15 11.9
dep 4:05 4:15
1.06 21.71 Llanfaglan Rd OB 5:28 5:29
1.65 22.65 Bontnewydd 7:48 16.9 7:43 17.7
1.94 23.12 Plas y Bont UB 8:57 17.2 9:01 15.2
2.21 23.56 Plas Dinas OB 9:55 16.9 10:08 14.6
2.43 23.87 Dinas Farm Xg 10:38 16.1 10:51 16.1
2.67 24.30 DINAS 12:29 13:02
---- ----- -----
0.00 0:00 0:00
0.24 23.87 Dinas Farm Xg 1:52 1:59
0.46 23.56 Plas Dinas OB 2:36 15.7 2:48 14.1
0.73 23.12 Plas y Bont UB 3:38 15.8 3:42 18.2
1.02 22.65 Bontnewydd 4:44 17.9 4:43 19.4
1.61 21.71 Llanfaglan Rd OB 6:54 16.2 7:14 13.9
1.78 21.43 Hendy LC 7:47 8:09
7:54 8:16
2.08 20.95 Coed Helen OB 9:43 9:49
2.49 20.29 Lon Parc FB 11:13 16.4 11:14 17.3
2.67 20.00 CAERNARFON 12:51 12:28
---- ----- -----
Workings: ex Caernarfon 3.00pm 2.00pm
ex Dinas 1.30pm 3.30pm
dep: Caernarfon 3.00pm 2.03pm
arr: Dinas 3.13pm 2.16pm
dep: Dinas 1.30pm 3.30pm
arr: Caernarfon 1.43pm 3.43pm
----------------------------------------------------------------------
Ffestiniog Railway Preserved Railways Archives Page