NENE VALLEY RAILWAY: ORTON MERE-YARWELL & RETURN
Engine: BR Class 5MT 4-6-0 no 73050
Load: 6 coaches, 203 tons tare, 210 tons full
--------------------------------------------------
miles m/sec mi/hr
--------------------------------------------------
0.00 ORTON MERE 0:00
0.70 mp 44¾ 2:35 25
1.00 Ferry Meadows 3:52
---- ----
0.00 0:00
0.45 mp 44 1:53 29
0.90 Lynch Bridge 3:11 10*
1.70 mp 42¾ 5:28 30
2.45 mp 42 (Castor) 7:01 27
3.20 mp 41¼ 8:37 29
3.70 Nene Bridge 10:22 10*
3.80 WANSFORD 11:48 easy
4.20 Tunnel In 13:02 15*
4.55 Tunnel Out 14:33
4.80 YARWELL MILL 16:13
---- -----
0.00 0:00
0.25 Tunnel In 1:34 15*
0.60 Tunnel Out 3:01
1.00 WANSFORD 4:53
---- ----
0.00 0:00
0.10 Nene Bridge 0:54 15*
1.35 mp 42 (Castor) 3:44 35/30
2.35 mp 43 5:57 26
2.90 Lynch Bridge 7:40 10*
3.35 mp 44 9:27 20
Ferry Meadows LC 10:59 10*
3.80 Ferry Meadows 11:38
---- -----
0.00 0:00
0.80 mp 45¼ sigs 5*
1.00 ORTON MERE 5:17
---- ----
Date: 19th May 1984:
dep: Orton Mere 3.30pm
arr: Yarwell Mill 3.51pm
dep: Yarwell Mill 4.02pm
arr: Orton Mere 4.39pm
mileages are approximate
-----------------------------------------------------
Back to Review: B.R Standard Locomotives Page