NORTH YORK MOORS RAILWAY: 1.30pm PICKERING-GROSMONT: Engine: BR Class 4MT 2-6-0 no 76079 Load: 8 coaches, 267 tons tare, 280 tons gross ----------------------------------------------------- miles sch m/sec mi/hr ----------------------------------------------------- 0.00 LEVISHAM 0 0:00 0.94 mp 13.5 3:06 27 1.44 mp 14 (top 1/60) 4:16 24 1.94 mp 14.5 5:22 27 2.69 mp 15.25 (top 1/49) 7:14 21 23 3.19 Newtondale 11 9:03 ---- -- ----- 0.00 0 0:00 slack 15* 1.25 mp 17 3:06 34 2.00 mp 17.75 (top 1/54) 5:14 30 2.50 mp 18.25 6:09 36 slack 20* 4.25 mp 20 9:47 38 sigs 10* 5.36 GOATHLAND 15 13:43 ---- -- ----- 0.00 0 0:00 0.64 mp 21.75 2:17 28/18* 1.64 mp 22.75 5:01 24/22 2.64 mp 23.75 7:16 32 sigs 0* 3.18 Grosmont Tunnel In 10:58 3.39 GROSMONT 15 11:47 ---- -- ----- Date: 5th October 1991: dep: Levisham 2.04pm, 15 late arr: Grosmont 3.01pm..29 late ----------------------------------------------------- NORTH YORK MOORS RAILWAY: 5.55pm GROSMONT-PICKERING: Engine: BR Class 4MT 2-6-0 no 76079 Load: 8 coaches, 267 tons tare, 280 tons full ----------------------------------------------------- miles sch m/sec mi/hr ----------------------------------------------------- 0.00 GROSMONT 0 0:00 0.21 Grosmont Tunnel Out 1:52 0.75 mp 23.75 2:50 19 1.75 mp 22.75 6:17 16 2.75 mp 21.75 9:38 19 3.39 GOATHLAND 15 13:21 ---- -- ----- 0.00 0 0:00 1.61 mp 19.5 3:43 32 slack 20* 3.86 mp 17 9:14 33 slack 15* 5.36 Newtondale 13:02 easy 6.36 mp 14.75 15:42 33 slack 25* 7.61 mp 13.5 18:22 32 8.55 LEVISHAM 27 21:38 ---- -- ----- 0.00 0 0:00 1.81 mp 10.75 (Farwath) 4:02 38 slack 15* 4.31 mp 8.25 9:23 29 5.10 New Bridge SB 11:34 15* 5.78 Uppermill Xg 15:10 5* 5.98 PICKERING 18 16:17 ---- -- ----- Date: 5th October 1991: dep: Grosmont 6.30pm..35 late arr: Pickering 7.38pm..41 late ----------------------------------------------------- Back to Review: B.R Standard Locomotives Page