WELSH MARCHES NORTH: SHREWSBURY-HEREFORD
Engine: BR Std 9F 2-10-0 No 92220 Evening Star
Load: 12 coaches, 450 tons tare, 475 tons full
-----------------------------------------------------
miles sch m/sec mi/hr
-----------------------------------------------------
0.00 SHREWSBURY 0 0:00
0.81 Sutton Bridge Jc SB 4 sigs 5*
2.25 mp 2.25 9:33 25
p.w.s 10*
4.25 mp 4.25 (Condover) 15:21 34
6.31 Dorrington SB 18:15 54/55
9.25 mp 9.25 (Leebotwood) 21:41 44
10.25 mp 10.25 23:05 41
11.75 mp 11.75 (All Stretton) 25:16 42/40
12.80 Church Stretton 24 26:43 47
15.38 Marsh Brook LC 29:49 56
16.75 mp 16.75 (Marsh Farm) 31:18 57/54
18.00 mp 18 32:41 55
sigs 20*
19.95 CRAVEN ARMS 36 37:04
----- -- -----
0.00 0 0:00
0.80 mp 20.75 2:43 30
2.92 Onibury 5:17 64
5.30 Bromfield 7:27 66
6.30 mp 26.25 8:21 66
7.58 Ludlow (OHBS) 10:49 10*
10.55 mp 30.5 15:29 63
12.19 Woofferton 20 16:58 66
13.80 mp 33.75 18:36 59
15.30 Berrington 19:56 68/66
58
18.40 Leominster 31 23:03 62/66
20.88 Ford Bridge p.w.s 30*
22.90 Dinmore Tunnel N 29:06 45
23.55 mp 43.5 (Dinmore) 30:50
26.88 Moreton-on-Lugg LC 32:53 69
28.30 mp 48.25 34:08 60
29.38 Shelwick Jc SB 50 35:13 56
31.11 HEREFORD 56 38:22
----- -- -----
Date: Saturday 17th April 1982
dep: Shrewsbury 11.21am..3 Late
arr: Hereford 12.59pm..11 Early
-----------------------------------------------------
Back to Review: B.R Standard Locomotives Page