SEVERN VALLEY RAILWAY: BEWDLEY-KIDDERMINSTER RTN
Engine: Class B12 4-6-0 no 8572
Load: 6 coaches, 199 tons tare, 215 tons full
--------------------------------------------------
miles m/sec mi/hr
--------------------------------------------------
(Avge)
0.00 BEWDLEY 0:00
0.19 Bewdley South SB 1:06 easy
0.46 mp 138 2:08 15.7
0.86 Rifle Range UB 2:59 28.2
1.33 Bewdley Tunnel S 3:50 33.1
1.60 Bewdley Tunnel N 4:21 31.3
2.04 Foley Park OB 5:19 27.3
2.46 mp 136 (Falling Sands V) 6:13 28.0
2.96 mp 135½ (Kidder Jn) 7:36 easy
3.51 KIDDERMINSTER 9:56
---- ----
0.00 0:00
0.55 mp 135½ 2:10
0.05 mp 136 (Falling Sands V) 3:17 26.9
1.47 Foley Park OB 4:06 30.8
1.91 Bewdley Tunnel N 5:13 23.6
2.18 Bewdley Tunnel S 5:49 27.0
2.65 Rifle Range UB 6:44 30.7
3.32 Bewdley South SB 8:30 easy
3.51 BEWDLEY 9:54
---- ----
Date: Saturday 19th September 1998:
11.35am ex Bridgnorth, 2.00pm ex Kidderminster
dep: Bewdley 12.46pm
arr: Kidderminster 12.56pm
dep: Kidderminster 2.00pm
arr: Bewdley 2.10pm
--------------------------------------------------
Back to Review: LNER Steam Page