FAIRBOURNE & BARMOUTH STEAM RAILWAY:
Date: 15 July 1990 23 Aug 1996
14 July 1990
Engine: Sherpa Bedgellert
Load: 7 coaches 7 coaches
------------------------------------------------------
m/sec m/sec
------------------------------------------------------
FAIRBOURNE 0:00 0:00
Ffordd Merion LC 1:04 1:08
Penrhyn Drive LC 2:11 2:19
Gorsaf 3:53 4:03
Passing Loop 6:19 arr 6:25
14:34 dep
Tunnel Entrance 18:43 10:25
PENRHYN POINT 21:22 13:37
----- -----
0:00 0:00
Tunnel Exit 2:46 2:38
Passing Loop 6:52 arr slow
17:45 dep 8:26
Gorsaf 19:37 10:08
Penrhyn Drive LC 21:19 12:01
Fford Merion LC 22:33 slow
FAIRBOURNE 23:49 15:49
----- -----
dep: Fairbourne 12.15pm 4.36pm
arr: Port Penrhyn 12.37pm 4.49pm
dep: Port Penrhyn 11.30am 11.31am
arr: Fairbourne 12.04pm 11.47am
Net Time: 26.03 27.07(net)
----------------------------------------------------------
UK Narrow Gauge Preserved Railways Archives Page