FAIRBOURNE & BARMOUTH STEAM RAILWAY:
Date: 14 July 1990 21 Sept 1997
15 July 1990
Engines: Russell Ashorne
Bedgellert
Assisting on return only Sherpa
Load: 7 coaches 5 coaches
------------------------------------------------------
m/sec m/sec
------------------------------------------------------
FAIRBOURNE 0:00 0:00
Ffordd Merion LC 1:07 1:14
Penrhyn Drive LC 2:18 2:36
Gorsaf 4:00 4:36
Passing Loop 5:52 6:34
Tunnel Entrance 10:01 11:21
PENRHYN POINT 12:56 14:24
----- -----
0:00 0:00
Loop
Tunnel Exit 2:21 2:43
Passing Loop 6:38 arr 6:48
11:15 dep
Gorsaf 13:01 8:59 arr
9:43 dep
Penrhyn Drive LC 14:37 12:03
Fford Merion LC stop 13:35
FAIRBOURNE 18:19 14:53
----- -----
dep: Fairbourne 10.49am 1.41pm
arr: Port Penrhyn 11.02am 1.55pm
dep: Port Penrhyn 1.14pm 2.23pm
arr: Fairbourne 1.32pm 2.38pm
Net Time: 25.42 (Net) 28.33
----------------------------------------------------------