RAVENGLASS & ESKDALE RAILWAY: DALEGARTH-RAVENGLASS
Engine: Northern Rock (2-6-2)
Load: 8 coaches
--------------------------------------------------
miles m/sec mi/hr
--------------------------------------------------
(Avge)
0.00 DALEGARTH 0:00
0.49 Beckfoot 3:02
0.94 mp 6 5:02 13.5
1.49 Fisherground Loop 8:11 10.5
1.94 mp 5 10:18 12.8
2.07 THE GREEN 11:17 7.9
2.69 mp 4¼ 14:05 13.3
2.82 IRTON ROAD 15:18
-----
15:36
3.44 mp 3½ 18:34
3.94 mp 3 20:43 13.9
4.44 mp 2½ 23:06 12.6
5.19 Miteside Loop 26:19 14.0
5.69 mp 1¼ 29:00 11.2
5.84 Muncaster Mill 29:41 13.2
6.44 mp ½ 32:06 14.9
6.94 RAVENGLASS 35:00
----- -----
Date: 6th September 1979:
dep: Dalegarth 4.05pm
arr: Ravenglass 4.40pm
Running time 34:42
--------------------------------------------------
RAVENGLASS & ESKDALE RAILWAY: RAVENGLASS-DALEGARTH
Engine: Northern Rock (2-6-2)
Load: 8 coaches
--------------------------------------------------
miles m/sec mi/hr
--------------------------------------------------
(Avge)
0.00 RAVENGLASS 0:00
0.50 mp ½ 2:50
1.11 Muncaster Mill 6:06
----
0:00
1.75 Miteside Loop 3:33
2.50 mp 2½ 7:16 12.1
3.00 mp 3 9:32 13.2
3.50 mp 3½ 11:26 15.8
4.00 mp 4 13:19 15.9
4.12 IRTON ROAD 14:43
-----
0:00
4.50 mp 4½ 1:47
4.87 THE GREEN 3:40
----
0:00
5.00 mp 5 1:24
5.45 Fisherground Loop 3:59
----
7:20
6.00 mp 6 10:54
6.45 Beckfoot 12:49 14.1
6.94 DALEGARTH 15:53
---- -----
Date: 5th August 1980:
dep: Ravenglass 2.27pm
arr: Dalegarth 3.09pm
Net Running time 37:01
--------------------------------------------------
UK Narrow Gauge Preserved Railways Archives Page