RAVENGLASS & ESKDALE RAILWAY: RAVENGLASS-DALEGARTH
Engine: River Irt (0-8-2)
Load: 8 coaches
--------------------------------------------------
miles m/sec mi/hr
--------------------------------------------------
0.00 RAVENGLASS 0:00
0.75 mp ¾ 3:35 15
1.11 Muncaster Mill 5:26
----
5:39
1.50 mp 1½ 8:03 13
1.75 Miteside Loop 8:49 easy
2.25 mp 2¼ 11:56 10½
2.75 mp 2¾ 14:00 15½
3.50 mp 3½ 16:56 15
4.00 mp 4 19:00 easy
4.12 IRTON ROAD 20:19
-----
20:44
4.50 mp 4½ 22:33 15
4.87 THE GREEN 24:01 easy
5.00 mp 5 24:58 11
5.45 Fisherground Loop 27:51
-----
31:30
5.50 Fisherground Halt 32:39 easy
6.00 mp 6 35:13 15½
6.45 Beckfoot 37:14 13
6.94 DALEGARTH 39:43
---- -----
Date: 11th July 1991:
3.00pm ex Ravenglass
dep: Ravenglass 3.02pm..2 late
arr: Dalegarth 3.41pm
Net Running Time 35:26
--------------------------------------------------
RAVENGLASS & ESKDALE RAILWAY: DALEGARTH-RAVENGLASS
Engine: River Irt (0-8-2)
Load: 8 coaches
--------------------------------------------------
miles m/sec mi/hr
--------------------------------------------------
0.00 DALEGARTH 0:00
0.49 Beckfoot 3:32
----
4:03
0.94 mp 6 6:21 17/10*
1.44 Fisherground Halt 9:00
----
9:17
1.49 Fisherground Loop 10:24 easy
1.94 mp 5
2.07 THE GREEN 14:20
-----
14:39
2.44 mp 4½ 16:30 13/14
2.82 IRTON ROAD 18:01 easy
3.44 mp 3½ 21:12 15/14½
3.94 mp 3 22:58 18½
4.44 mp 2½ 24:48 14*
5.19 Miteside Loop 28:04 easy
5.69 mp 1¼ 30:43 17
5.84 Muncaster Mill 31:30
-----
31:42
6.44 mp ½ 34:27 20½
6.94 RAVENGLASS 37:27
----- -----
Date: 11th July 1991:
4.00pm ex Dalegarth
dep: Dalegarth 3.30pm..5 late
arr: Ravenglass 4.08pm
Net Running Time 36:08
--------------------------------------------------
UK Narrow Gauge Preserved Railways Archives Page