RAVENGLASS & ESKDALE RAILWAY: RAVENGLASS-DALEGARTH
Engine: River Mite (2-8-2)
Load: 8 coaches
--------------------------------------------------
miles m/sec mi/hr
--------------------------------------------------
0.00 RAVENGLASS 0:00
0.75 mp ¾ 3:44
1.11 Muncaster Mill 5:12 14.7
1.50 mp 1½ 6:53 13.9
1.75 Miteside Loop 8:34 8.9
2.25 mp 2¼ 10:24 16.4
2.75 mp 2¾ 12:35 13.7
3.50 mp 3½ 15:37 14.8
4.00 mp 4 17:36 15.1
4.12 IRTON ROAD 19:01
-----
20:20
4.50 mp 4½
4.87 THE GREEN 23:59
-----
24:10
5.45 Fisherground Loop 27:55
6.00 mp 6 30:51 11.2
6.45 Beckfoot 32:55 13.1
6.94 DALEGARTH 36:03
---- -----
Date: 2nd August 1979:
dep: Ravenglass 3.26pm
arr: Dalegarth 4.02pm
Net Running time 34:33
--------------------------------------------------
RAVENGLASS & ESKDALE RAILWAY: DALEGARTH-RAVENGLASS
Engine: River Mite (2-8-2)
Load: 8 coaches
--------------------------------------------------
miles m/sec mi/hr
--------------------------------------------------
(Avge)
0.00 DALEGARTH 0:00
0.49 Beckfoot 2:53
0.94 mp 6 4:53 13.5
1.49 Fisherground Loop 7:47 11.4
1.94 mp 5 9:40 14.3
2.07 THE GREEN 10:53
-----
11:04
2.69 mp 4¼
2.82 IRTON ROAD 14:45
-----
19:54
3.44 mp 3½ 23:02
3.94 mp 3 25:03 14.9
4.44 mp 2½ 27:20 13.1
5.19 Miteside Loop 30:47 13.0
5.69 mp 1¼ 33:15 12.2
5.84 Muncaster Mill 33:47 16.9
6.44 mp ½ 35:59 16.4
6.94 RAVENGLASS 38:48
----- -----
Date: 2nd August 1979:
dep: Dalegarth 4.25pm
arr: Ravenglass 5.04pm
Net Running time 33:28
--------------------------------------------------
UK Narrow Gauge Preserved Railways Archives Page