VALE OF RHEIDOL: ABERYSTWYTH-DEVILS BRIDGE:
Engine: No 9 Prince of Wales
Load: 6 coaches
-----------------------------------------------------
miles m/sec mi/hr
-----------------------------------------------------
0.00 ABERYSTWYTH 0:00
0.56 mp 0.75 2:33 16
1.01 Llanbadarn LC 4:33 easy
2.13 Glanrafon 9:13 17/16
3.31 mp 3.5 13:10 19
4.41 Capel Bangor 17:09 easy
5.06 mp 5.25 19:57 16
5.56 mp 5.75 22:20 10
6.06 mp 6.25 23:34 16
6.53 NANTYRONEN 27:40 13
7.06 mp 7.25 30:11 10/12
7.47 ABERFFRWD 32:46
-----
0:00
7.81 mp 8 1:47 14
8.56 mp 8.75 6:19 9/10
9.06 mp 9.25 (Rheidol Falls) 9:36 9
9.56 mp 9.75 13:01 8
10.06 mp 10.25 16:02 11
10.68 Rhiwfron 19:16 9
11.06 mp 11.25 20:04 9
11.56 mp 11.75 26:20 7
11.71 DEVILS BRIDGE 27:28
----- -----
Date: 4th May 1981:
Working: 2.50pm ex Aberystwyth:
dep: Aberystwyrh 3.03pm..13 late
arr: Devils Bridge 4.14pm..7 late
Net Running time 60.14
Schedule 32 + 25 57 mins
--------------------------------------------------
VALE OF RHEIDOL: DEVILS BRIDGE-ABERYSTWYTH:
Engine: No 8 Llewelyn
Load: 6 coaches
---------------------------------------------------
miles m/sec mi/hr
---------------------------------------------------
(Avge)
0.00 DEVILS BRIDGE 0:00
1.03 Rhwfron 4:08
2.63 Rheidol Falls 13:55 9.8
4.24 ABERFFRWD 21:01
-----
0:00
5.08 NANTYRONEN 4:47
7.30 Capel Bangor 13:56 14.6
9.58 Glanrafon 22:01 16.9
10.70 Llanbadarn LC 26:16 15.8
11.71 ABERYSTWYTH 30:22
----- -----
Date: 4th May 1981:
Working: 4.35pm ex Devils Bridge:
dep: Devils Bridge 4.44pm..9 late
arr: Aberystwyth 5.47pm
Net Running time: 51.23
Schedule 25 + 32 57 mins
--------------------------------------------------
UK Narrow Gauge Preserved Railways Archives Page