VALE OF RHEIDOL: ABERYSTWYTH-DEVILS BRIDGE:
Engine: No 8 Llewelyn
Load: 6 coaches
-----------------------------------------------------
miles m/sec mi/hr
-----------------------------------------------------
0.00 ABERYSTWYTH 0:00
0.56 mp 0.75 2:51 13
1.01 Llanbadarn LC 4:50 easy
2.13 Glanrafon 9:13 17/16
3.31 mp 3.5 14:04 17
4.41 Capel Bangor 18:09 easy
5.06 mp 5.25 20:59 16
5.56 mp 5.75 23:55 7
6.06 mp 6.25 26:21 13
6.53 NANTYRONEN 29:51
-----
0:00
7.06 mp 7.25 3:43 12
7.47 ABERFFRWD 6:26
----
0:00
7.81 mp 8 1:44 16
8.56 mp 8.75 5:55 10/11
9.06 mp 9.25 (Rheidol Falls) 8:43 11
9.56 mp 9.75 11:32 11
10.06 mp 10.25 13:56 15
10.68 Rhiwfron 17:14 11
11.06 mp 11.25 19:28 10
11.56 mp 11.75 22:32 9
11.71 DEVILS BRIDGE 23:22
----- -----
Date: 16th October 1982:
Working: 1.50pm ex Aberystwyth:
dep: Aberystwyrh 1.50pm..R time
arr: Devils Bridge 3.00pm
Net Running time 59.39
Schedule 57 mins
--------------------------------------------------
VALE OF RHEIDOL: DEVILS BRIDGE-ABERYSTWYTH:
Engine: No 8 Llewelyn
Load: 6 coaches
---------------------------------------------------
miles m/sec mi/hr
---------------------------------------------------
(Avge)
0.00 DEVILS BRIDGE 0:00
1.03 Rhwfron 5:15
2.63 Rheidol Falls 14:20 10.6
4.24 ABERFFRWD 23:34
-----
0:00
5.08 NANTYRONEN 5:28
----
0:00
7.30 Capel Bangor 9:55
9.58 Glanrafon 19:46 13.9
10.70 Llanbadarn LC 24:27 14.3
11.71 ABERYSTWYTH 28:55
----- -----
Date: 16th October 1982:
Working: 3.40pm ex Devils Bridge:
dep: Devils Bridge 3.43pm..3 late
arr: Aberystwyth 4.42pm
Net Running time: 57.57
Schedule 25 + 32 57 mins
--------------------------------------------------
UK Narrow Gauge Preserved Railways Archives Page