VALE OF RHEIDOL: ABERYSTWYTH-DEVILS BRIDGE:
Engine: No 7 Owain Glyndwr
Load: 5 coaches
-----------------------------------------------------
miles m/sec mi/hr
-----------------------------------------------------
0.00 ABERYSTWYTH 0:00
0.56 mp 0.75 2:42 16
1.01 Llanbadarn LC 4:29 easy
2.13 Glanrafon 10:02 15/11
3.31 mp 3.5 15:39 14
4.41 Capel Bangor 20:58 11/13
5.06 mp 5.25 24:19 11/12
5.56 mp 5.75 26:51 12
6.06 mp 6.25 29:52 9/11
6.53 NANTYRONEN 33:07
-----
0:00
7.06 mp 7.25 3:13 11
7.47 ABERFFRWD 7:03
----
0:00
7.81 mp 8 1:47 14
8.56 mp 8.75 6:24 9/11
9.06 mp 9.25 (Rheidol Falls) 9:22 9
9.56 mp 9.75 12:30 9/10
10.06 mp 10.25 15:31 11
10.68 Rhiwfron 18:55 9
11.06 mp 11.25 21:24 8
11.56 mp 11.75 25:14 7/8
11.71 DEVILS BRIDGE 26:18
----- -----
Date: 25th May 1987:
Working: 12.55pm ex Aberystwyth:
dep: Aberystwyrh 1.04pm..9 late
arr: Devils Bridge 2.15pm..20 late
Net Running time 66.28
Schedule 32 + 25 57 mins
--------------------------------------------------
VALE OF RHEIDOL: DEVILS BRIDGE-ABERYSTWYTH:
Engine: No 9 Prince of Wales
Load: 5 coaches
---------------------------------------------------
miles m/sec mi/hr
---------------------------------------------------
(Avge)
0.00 DEVILS BRIDGE 0:00
1.03 Rhwfron 6:02
2.63 Rheidol Falls 15:08
-----
0:00
4.24 ABERFFRWD 8:28
5.08 NANTYRONEN 13:10
-----
0:00
7.30 Capel Bangor 10:49 14.6
9.58 Glanrafon 21:38 16.9
10.70 Llanbadarn LC 27:16 15.8
11.71 ABERYSTWYTH 31:57
----- -----
Date: 25th May 1987:
Working: 3.10pm ex Devils Bridge:
dep: Devils Bridge 3.38pm..28 late
arr: Aberystwyth 4.40pm..30 late
Net Running time: 60.15
Schedule 25 + 32 57 mins
--------------------------------------------------
UK Narrow Gauge Preserved Railways Archives Page