TALYLLYN RAILWAY: TOWYN WHARF-NANT GWERNOL:
Date: 15th September 1997
Engine: no/name no 3 Sir Haydn
Load: no 3 bogies +4(4w)
--------------------------------------------------
miles m/sec mi/hr
--------------------------------------------------
0.00 TOWYN WHARF 0:00
0.25 mp ¼ 1:52
Pendre SB arr 2:48 Token
dep 3:54 Stop
0.38 Towyn Pendre 4:54
----
0:00
0.75 mp ¾ 1:43 13½
0.92 Hendy 2:41 10
1.42 Fach Goch 5:08 15
1.86 Cynfal 6:58 12½
2.14 Rhydyronen 8:20 easy
2.46 Tyn-y-llwyn 9:50 14½
2.75 mp 2¾ 10:55 15
Brynglas Loop SB arr 13:19 Token
dep 16:28 Stop
3.19 Brynglas 17:12
4.00 mp 4 21:05 14½/14
4.50 mp 4½ 23:12 15
4.89 DOLGOCH 25:22
-----
0:00
5.25 mp 5¼ 2:16 11½
5.34 Quarry Sdg SB arr 3:10 Token
dep 4:21 Stop
6.25 mp 6¼ 9:19 13
6.55 ABERGYNOLWYN 11:27
-----
0:00
6.80 Forestry LC 2:26 easy
7.00 mp 7 3:33 11½
7.35 NANT GWERNOL 5:32
---- ----
Working ex Towyn Wharf: 11.40am
dep: Town Wharf 11.40am
arr: Nant Gwernol 12.33pm
--------------------------------------------------
TALYLLYN RAILWAY: NANT GWERNOL-TOWYN WHARF:
Date: 25th August 1986
Engine: no/name no 3 Sir Haydn
Load: no 4 bogies +2(4w)
--------------------------------------------------
miles m/sec mi/hr
--------------------------------------------------
0.00 NANT GWERNOL 0:00
0.35 mp 7 1:46 13
0.55 Forestry LC 2:50 easy
stop 0*
0.80 ABERGYNOLWYN 5:36
----
0:00
1.60 mp 5¾ 3:56 16½
2.01 Quarry Sdg SB 6:05
----
0:00
2.35 mp 5 2:00 13½
2.46 DOLGOCH 2:54
----
0:00
3.35 mp 4 3:57 17
4.16 Brynglas 7:38
----
0:00
4.89 Tyn-y-llwyn 4:38 15½
5.21 Rhydyronen 5:45
----
0:00
5.49 Cynfal 1:31 14
5.93 Fach Goch 3:10 16/14½
6.41 Hendy 5:13 16
6.97 Towyn Pendre 8:00
----
0:00
7.10 mp ¼ 1:24
7.35 TOWYN WHARF 3:23
---- ----
Working ex Nant Gwernol: 5.13pm
dep: Nant Gwernol 5.13pm
arr: Towyn Wharf 5.58pm
---------------------------------------------------
UK Narrow Gauge Preserved Railways Archives Page