TALYLLYN RAILWAY: TOWYN PENDRE-ABERGYNOLWYN:
Date: 25th August 1986
Engine: no/name no 4 Edward Thomas
Load: no 3 bogies +4(4w)
--------------------------------------------------
miles m/sec mi/hr
--------------------------------------------------
0.00 TOWYN WHARF
0.38 Towyn Pendre 0:00
0.75 mp ¾ 2:14 13
0.92 Hendy 3:10 11
1.42 Fach Goch 5:26 15½
1.86 Cynfal 7:15 12½
2.14 Rhydyronen 8:55
----
0:00
2.46 Tyn-y-llwyn 2:44 14
2.75 mp 2¾ 3:48 15½
3.19 Brynglas 5:52 easy
4.00 mp 4 9:39 15/13
4.50 mp 4½ 11:56 15
4.89 DOLGOCH 14:05
-----
0:00
5.25 mp 5¼ 2:20 11
5.34 Quarry Sdg SB 2:58 easy
6.25 mp 6¼ 6:49 15½
6.55 ABERGYNOLWYN 8:49
---- ----
Working ex Towyn Wharf: 12.00pm
dep: Town Pendre 12.13pm
arr: Abergynolwyn 12.47pm
--------------------------------------------------
TALYLLYN RAILWAY: ABERGYNOLWYN-TOWYN WHARF:
Date: 18th August 1999
Engine: no/name no 4 Peter Sam
Load: no 3 bogies +4(4w)
--------------------------------------------------
miles m/sec mi/hr
--------------------------------------------------
0.00 NANT GWERNOL
0.80 ABERGYNOLWYN 0:00
1.60 mp 5¾ 4:11 15½
2.01 Quarry Sdg SB 6:11 easy
2.35 mp 5 8:08 13
2.46 DOLGOCH 9:00
----
0:00
3.35 mp 4 4:33 16½
4.16 Brynglas 8:32
----
0:00
Brynglas Loop SB 1:05 easy
4.89 Tyn-y-llwyn 4:27 14
5.21 Rhydyronen 6:29
----
0:00
5.49 Cynfal 1:39 14½
5.93 Fach Goch 13½
6.41 Hendy 5:30 15
6.97 Towyn Pendre 7:56
----
0:00
7.10 mp ¼ 1:56
7.35 TOWYN WHARF 4:01
---- ----
Working ex Nant Gwernol: 1.30pm
dep: Abergynolwyn 2.32pm
arr: Towyn Wharf 3.12pm
---------------------------------------------------
UK Narrow Gauge Preserved Railways Archives Page